Skip to main content
Version: 2027 R1

Transition paths

A transition path connects two workflow steps and lets an element move from one step to the other. While on the form in the Portal a path is shown as a button, in Designer Studio it takes the form of an arrow connecting two steps (the arrow's name is also the label of the path's button on the form).

Creating a transition path​

To create a transition path:

  1. Open the Workflow Designer and locate, on the diagram, the step the path should leave from.

  2. Hover over the edge of the selected step – this makes white dots (ports) appear on it.

  3. Click one of the ports and drag the resulting line to the target step.

    Path_Dragging.png

The newly created path is given the default name Go to next step. It is also automatically selected on the diagram, and the Path configuration panel opens on the right. (To reopen this panel for an existing path, simply click its arrow on the diagram.)

tip

A single step can have multiple outgoing paths – each one appears on the form as a separate button. The button order can be changed by dragging the paths in the Transition paths tab of the Step configuration panel.

Path_Arranging.png

The Path configuration panel is divided into five tabs: General, Behavior, Task creation, Automations, and Advanced. A detailed description of the configuration available in each of them is available in the Configuration chapter.