Skip to main content
Version: 2027 R1

Step Types

The step type determines how the item currently in a given step behaves, and what rules apply from the moment the item enters it. Once the step has been placed on the workflow's graphical diagram, its type can be changed in the Step type field on the Basic tab (this does not apply to the start step, which is created automatically and cannot be changed). The Steps palette in the Workflow Designer groups the remaining step types into two categories: General and System.

Start step​

Start step tile

The start step is the first step of the workflow – this is where a new item is registered and its basic properties are filled in. Note that an item in the start step is not saved to the database until it is moved along any path leading out of this step, or until the Save button in the form's top panel is clicked. Every workflow has exactly one start step.

Intermediate​

Intermediate step icon

The intermediate step is the universal step type – use it wherever the specific properties of the other types are not needed. An intermediate step most often represents a task or procedure that the user must complete before the item moves to the next step.

Flow control​

Flow control step icon

A flow control step automatically chooses the transition path based on conditions defined by a business rule – the item leaves the step without any user involvement. For this reason, there is no need to assign tasks to users in a flow control step – the transition to the next step is performed by the system. If the rule does not return a path identifier, the default path is chosen.

info

More information about flow control can be found in this article on the technical blog.

Final​

Final step icons – negative and positive

A final step is the last stage of the workflow – it marks the point where the business process ends. Users assigned to this step don't need any assigned tasks, and the item's status changes automatically the moment it enters the step (if the item has a parent workflow and that parent is in the Wait for sub-workflows step, sub-workflow verification is triggered on the parent item). Two variants of this step are available: Final (positive), upon entering which the item receives the Completed positively status, and Final (negative), upon entering which the item receives the Completed negatively status.

The item's status can matter for reporting purposes, and for the Wait for sub-workflows system step, if the item has a parent workflow.

System​

System step icon

Tasks in a system step are not closed even when the Complete users' tasks option is used in administrator mode – instead, they are moved to the next step. Standard e-mail messages are not sent when the item leaves a system step. Moreover, if the next step is also a system step, no task assignment is required on the path leading to it – there will then be no user with an assigned task in the system step.

info

More information can be found in the article How system steps work (Polish only).

Wait for a scan​

Wait for a scan step icon

The item stays in this step until the WEBCON WorkFlow Service's folder-monitoring service recognises the barcode on a scanned document and attaches the file to the item's attachment list. Once the file is recognised, the item automatically moves to the next step via its default path. Use this step wherever an item must have the original document attached before the process can continue (for example, for an invoice approval process that cannot proceed without a scan).

Wait for sub-workflows​

Wait for sub-workflows step icon

This step handles communication between a parent workflow and its sub-workflows. The parent item waits in this step for a change in the sub-workflows' status, and leaves it via one of the available paths. The path can be chosen based on one of the predefined scenarios, or determined using an SQL query.

Wait for a text layer / an OCR AI / an OCR AI to learn​

Wait for a text layer, an OCR AI, and an OCR AI to learn step icons

Intermediate steps in which workflow items remain while their attachments wait in the corresponding processing queue – the text layer queue, the OCR AI recognition queue, or the OCR AI training queue. The item automatically leaves the step once all of the document's attachments have been processed.

info

Each of the three steps above should have a path leading to it with the corresponding action defined. Keep in mind that the action cannot be defined on the step's entry.